New tiled shower in Pittsville, MO
Pittsville, MO · Fall 2026
A homeowner wanted a new tiled shower. One of our pros tiled the walls with large marble-look tiles, laid a pebble mosaic on the shower floor for grip, and set built-in corner shelves. It took about a month from the request to the finished shower.
- Job:
- New tiled shower
- Where:
- Pittsville, MO
- Done by:
- A FixNeighbor pro
- Request to done:
- About 1 month


What was done
- Agree on the layout, tile, shelves and fixtures.
- Prepare and waterproof the walls and shower floor.
- Set the large wall tiles with tight, straight grout lines and build in the corner shelves.
- Lay the pebble mosaic on the sloped floor toward the drain.
- Grout, seal, and install the shower head and valve trim.
Worth knowing before you tile a shower
- Waterproofing behind the tile is what keeps a shower from leaking — tile and grout alone are not waterproof. Ask your pro what system they use.
- Large wall tiles mean fewer grout lines to clean, but the wall must be very flat.
- Small mosaic or pebble tile on the floor follows the slope to the drain and gives better grip than big tiles.
- Allow time: tile choice and delivery often take longer than the install. Choose tile early.
Need something similar?
Describe your job once on FixNeighbor — online or by text to (816) 816-4844 — and add a few photos. Local pros who do this work send you their prices, and you choose. Homeowners pay no service fee.
Questions
- How long does a new tiled shower take?
- About a month from the request to done here, including choosing and getting the tile. Waterproofing and grout need drying time between steps.
- What should I send to get quotes for a tiled shower?
- The shower size, photos of the space as it is now, the tile you like (or a picture of it), whether old tile has to come out, and the fixtures you want.
More
Handyman in Kansas CityConcrete footing for a new house in Pittsville, MO125-amp subpanel wired in Independence, MOSix 125-amp services connected at a commercial building in Warrensburg, MONew kitchen countertops with an island in Holden, MOSpray foam insulation in a new home, Lone Jack, MOLow pressure pipe (LPP) septic system installed in Pittsville, MOLarge block retaining wall in Warrensburg, MONew air conditioner installed in Lone Jack, MONew house framing and roof in Pittsville, MONew concrete access driveway in Warrensburg, MOSpray cellulose wall insulation in a new building, Warrensburg, MOKansas City cost guidesHow to get repair quotes